Commercial EV Charger Installation: What Property Owners and Employers Need to Plan
By Electrical Support Company · November 24, 2026
Installing electric vehicle (EV) chargers at a business comes down to four decisions: which charger level fits how long vehicles will be parked, whether your electrical service has the capacity, how the chargers will share power, and who pays for and manages them. Getting those right before you buy hardware prevents the most common and most expensive problems.
This guide walks through each decision for property owners, facility managers and employers in King and Snohomish County. For our service overview, see commercial EV charger installation.
Step 1: Match the Charger Level to the Parking Pattern
| Level | Power supply | Best for |
|---|---|---|
| Level 1 | Standard 120 volt outlet | Very long dwell times. Slow, rarely the right choice for business use. |
| Level 2 | 240 volt circuit | Workplaces, apartment and office parking, retail and hotels where vehicles stay for hours. The common commercial choice. |
| DC fast charging | Three-phase power, typically 480 volts | Short stops, fleets with quick turnaround, highway-style sites. Needs much more electrical capacity. |
Employees who park for a full shift, fleet vehicles that sit overnight, and tenants in an apartment building are all well served by Level 2. DC fast charging only makes sense when drivers need a large amount of range in under an hour.
Step 2: Check Your Electrical Capacity
Chargers are a continuous load, which means they run for hours at a time. The National Electrical Code requires the supply circuit to be sized at 125 percent of the charger’s continuous current, so a charger drawing 32 amps needs a circuit rated for at least 40 amps.
Multiply that across a row of chargers and the building’s service can run out of room quickly. Before you pick a charger count, have an electrician review:
-
The size and condition of the main service and the available spare capacity.
-
The distance from the electrical room to the parking area, which drives conduit, wire and trenching work.
-
Whether a new panel or sub-panel is needed, and whether the utility has to upgrade its service. If capacity is the issue, see our commercial panel and service upgrade service.
Measured demand data from the building is more reliable than nameplate ratings when judging how much room you really have.
Step 3: Use Load Management to Install More Chargers on Less Power
An energy management system lets several chargers share a limited amount of power instead of each reserving its full rating. The code allows the supply to be sized to the system’s set limit. For many properties this is the difference between installing four chargers on existing capacity and paying for a service upgrade. It also lets you build the conduit for future chargers now and add the units later.
Step 4: Plan the Site, Not Just the Chargers
-
Conduit and trenching. The underground work is often the largest part of the cost and schedule. Install oversized conduit or spare conduit now if you expect to add chargers.
-
Mounting. Wall-mounted units are simplest. Pedestal units need a concrete base, which adds work.
-
Protection. Bollards and wheel stops protect equipment in drive aisles.
-
Accessibility. Confirm accessible parking and route requirements for your site with the permit authority.
-
Signage and striping. Mark the stalls so the spaces are used as intended.
-
Network and payment. Decide whether chargers are free for tenants or staff, billed per session, or tied to fleet accounts. Networked chargers need reliable data service.
Permits and Utility Coordination
Charger installations require an electrical permit, and larger projects may also need building permit review. Who issues the permit depends on the city. We confirm the permitting authority for the address before we price the job. If the work needs a new or larger service, the electric utility has to be involved early, because utility lead times can set the schedule.
Incentives and Cost
Federal, state and utility programs for commercial charging change often, and eligibility depends on location, charger type and when the project is approved. Check current programs before you commit and make sure any required pre-approval is in hand before work starts. Cost varies widely with distance to the electrical room, trenching, panel work, the number of chargers and the hardware chosen, so get a written scope and itemized proposal rather than a per-charger quote.
An Example From the Field
We installed EV charging for a Washington State agency fleet lot. The job included trenching and multiple conduit runs, concrete bases, wall-mounted chargers, protective bollards, signage and painted charging stalls, all while the lot stayed in operation. You can see the photos on the DSHS fleet lot project page.
What to Ask Your Electrician
- Have you reviewed our service capacity with real demand data?
- Can load management reduce what we need to upgrade?
- Is the conduit sized for the chargers we want in three to five years?
- Who pulls the permit and coordinates with the utility?
- What is included in the proposal: trenching, patching, striping, signage and commissioning?
Frequently Asked Questions
Which EV charger level should a business choose?
Level 2 for most workplaces, apartment and office parking and retail, because vehicles stay parked for hours. DC fast charging is for short stops and needs substantially more electrical capacity.
Does my building need a service upgrade for EV chargers?
Not always. A load review shows how much spare capacity you have. Load management often allows several chargers on existing service, and an upgrade is needed only when measured demand plus the chargers exceeds what the service can carry.
Do commercial EV chargers need a permit?
Yes. They need an electrical permit, and some projects need building permit review. We confirm the permitting authority for your address before pricing.
How long does a commercial EV charger installation take?
Time depends on trenching distance, whether a panel or service upgrade is needed, permit review and utility lead times. Install time for the chargers themselves is usually short compared with the preparation.
Can I add more chargers later?
Yes, if the conduit and capacity were planned for it. Installing spare conduit now is far cheaper than trenching again.
Talk to a Commercial Electrician
If you are planning this work in King or Snohomish County, call (425) 583-4869 or request a quote online. Electrical Support Company is a union signatory commercial electrical contractor based at 19031 33rd Ave W, Suite 301, Lynnwood, WA 98036.