Skip to main content
Request Service
Home / Commercial / EV Charger Installation
Commercial EV Charging

Commercial EV Charger and Charging Station Installation

Electrical Support Company installs commercial electric vehicle charging stations for fleet lots, workplace parking and customer parking across King and Snohomish counties. We check panel capacity first, then handle permits, trenching and conduit, charger mounting and inspection, so your chargers go live without overloading the building.

Request a Quote (425) 583-4869

EV Charging Station Installation for Fleet, Workplace and Customer Parking

Benefits

Why Businesses Choose Us for EV Charging

Capacity Checked First

We run a load analysis before anything is ordered, so you know whether your panel can carry the chargers or needs an upgrade.

Full Site Work

Trenching, conduit runs, concrete bases, bollards and stall signage handled by one licensed contractor.

Fleet and Government Experience

We have installed fleet charging for a Washington State agency and kept the lot operating during construction.

Room to Add Chargers

We size conduit and capacity so adding stations later does not mean tearing up the lot again.

Process

Our EV Charger Installation Process

01

Site and Load Assessment

We review your parking layout, your existing panel and service, and how many chargers you want now and later.

02

Design and Permitting

We plan circuit sizing and conduit routing, then pull the electrical permit.

03

Installation

Trenching, conduit, any panel or service upgrade, charger mounting, bollards and signage.

04

Testing and Turnover

We test every circuit, schedule the final inspection and hand over documentation for your records.

Results

Code-Driven EV Charging Installations

NEC 625
Charging systems installed to the National Electrical Code article that governs them
Level 2 & DC Fast
Charging circuits sized for the equipment you choose
FAQ

Common
questions.

How much power does a commercial EV charger need? +

A single Level 2 charger typically draws 30 to 50 amps, and a DC fast charger can need 100 to 200 amps or more. Even a few chargers can exceed the spare capacity of an older commercial panel, which is why we start with a load analysis.

Do I need a panel upgrade to add EV chargers? +

Not always. If the load analysis shows spare capacity, chargers can go on the existing service. If not, we handle the panel or service upgrade as part of the same project.

Do you install fleet EV charging? +

Yes. We installed EV charging for a Washington State Department of Social and Health Services fleet lot, from conduit runs and concrete bases to wall-mounted chargers, bollards and marked stalls.

Do you maintain existing charging stations? +

Yes. We inspect and service the electrical side of existing charging stations: the circuits, breakers, connections and the panel that feeds them.

Do you pull permits for EV charger installation? +

Yes. We pull the electrical permit and schedule the inspection for every commercial EV charger installation.

Related services

Other commercial services.

Service area

Where we deliver this service.

We provide ev charger installation across Western Washington, with crews dispatched from our Lynnwood headquarters.

Plan Your EV Charging Installation

Request a site assessment or call (425) 583-4869 to talk through chargers, capacity and timing.

Request a Quote (425) 583-4869