Commercial EV Charger and Charging Station Installation
Electrical Support Company installs commercial electric vehicle charging stations for fleet lots, workplace parking and customer parking across King and Snohomish counties. We check panel capacity first, then handle permits, trenching and conduit, charger mounting and inspection, so your chargers go live without overloading the building.
EV Charging Station Installation for Fleet, Workplace and Customer Parking
Fleet lots need enough chargers to turn vehicles around overnight. Workplace parking needs stations employees can share through the day. Customer parking needs chargers placed where drivers can find them, protected from vehicle impact. We plan the installation around which of these you are building, then run the conduit and circuits to match. For detailed questions on charger types, load management and permits, see our commercial EV charger questions and answers.
Why Businesses Choose Us for EV Charging
Capacity Checked First
We run a load analysis before anything is ordered, so you know whether your panel can carry the chargers or needs an upgrade.
Full Site Work
Trenching, conduit runs, concrete bases, bollards and stall signage handled by one licensed contractor.
Fleet and Government Experience
We have installed fleet charging for a Washington State agency and kept the lot operating during construction.
Room to Add Chargers
We size conduit and capacity so adding stations later does not mean tearing up the lot again.
Our EV Charger Installation Process
Site and Load Assessment
We review your parking layout, your existing panel and service, and how many chargers you want now and later.
Design and Permitting
We plan circuit sizing and conduit routing, then pull the electrical permit.
Installation
Trenching, conduit, any panel or service upgrade, charger mounting, bollards and signage.
Testing and Turnover
We test every circuit, schedule the final inspection and hand over documentation for your records.
Code-Driven EV Charging Installations
Common
questions.
How much power does a commercial EV charger need? +
A single Level 2 charger typically draws 30 to 50 amps, and a DC fast charger can need 100 to 200 amps or more. Even a few chargers can exceed the spare capacity of an older commercial panel, which is why we start with a load analysis.
Do I need a panel upgrade to add EV chargers? +
Not always. If the load analysis shows spare capacity, chargers can go on the existing service. If not, we handle the panel or service upgrade as part of the same project.
Do you install fleet EV charging? +
Yes. We installed EV charging for a Washington State Department of Social and Health Services fleet lot, from conduit runs and concrete bases to wall-mounted chargers, bollards and marked stalls.
Do you maintain existing charging stations? +
Yes. We inspect and service the electrical side of existing charging stations: the circuits, breakers, connections and the panel that feeds them.
Do you pull permits for EV charger installation? +
Yes. We pull the electrical permit and schedule the inspection for every commercial EV charger installation.
Other commercial services.
Where we deliver this service.
We handle commercial EV charger installation in Lynnwood, Everett, Mukilteo, Mountlake Terrace, Seattle, Bellevue and throughout King and Snohomish counties.
We provide ev charger installation across Western Washington, with crews dispatched from our Lynnwood headquarters.
Plan Your EV Charging Installation
Request a site assessment or call (425) 583-4869 to talk through chargers, capacity and timing.