What Is an Arc Flash Study? Requirements, Labels and When Your Commercial Building Needs One

By Electrical Support Company · November 24, 2026

An arc flash study is an engineering analysis that calculates how much energy an electrical fault could release at each piece of equipment in your building, and what protective gear and labels that equipment needs as a result. If your facility has switchboards, panelboards, motor control centers or disconnects that workers service while energized, the study tells you how dangerous each one is and what to do about it.

This guide explains what the study covers, when a commercial building needs one, how often it has to be refreshed, and where electricians and facility teams fit in. It is written for building owners, facility managers and property managers in King and Snohomish County, but the standards cited here apply nationwide.

What an Arc Flash Actually Is

An arc flash is an electrical explosion that happens when current jumps through the air between conductors or from a conductor to ground. It produces intense heat, a pressure wave and molten metal. Injuries are severe even when the person is standing several feet away, which is why the risk is measured as incident energy at a working distance, in calories per square centimeter.

Arc flash events are most often triggered during work on or near energized equipment: opening a panel cover, racking a breaker, or a tool slipping inside a cabinet. Loose connections, dust and moisture inside old gear raise the odds.

What Does an Arc Flash Study Include?

A complete study is usually performed by a qualified electrical engineer and has four parts:

  1. Data collection. Someone walks the facility and records the equipment: the utility service, transformers, switchgear, panels, breakers and fuses, cable sizes and lengths, and motors.
  2. Short-circuit study. This calculates the maximum fault current available at each point in the system.
  3. Protective device coordination study. This checks that when a fault happens, the breaker or fuse closest to it opens first, and how fast. Faster clearing means lower incident energy.
  4. Incident energy calculation. Using the calculation method in IEEE 1584, the engineer determines the arc flash energy at each location and the distance at which a person would receive a second-degree burn, called the arc flash boundary.

The deliverable is a report, a one-line diagram of your system, recommendations, and the equipment labels.

Which Standards Apply?

  • NFPA 70E. The National Fire Protection Association publishes NFPA 70E, Standard for Electrical Safety in the Workplace. It requires an arc flash risk assessment before workers approach energized equipment, defines the protective clothing categories, and says the assessment must be reviewed at least every five years and whenever a major change is made to the electrical system.

  • National Electrical Code, section 110.16. The code requires field-applied warning labels on equipment such as switchboards, panelboards, industrial control panels and motor control centers that are likely to need examination or maintenance while energized. The label warns of arc flash and shock hazards.

  • OSHA. The Occupational Safety and Health Administration requires employers to protect workers from recognized electrical hazards. OSHA does not name an arc flash study, but it commonly cites NFPA 70E as the accepted way to meet that duty.

  • IEEE 1584. This is the engineering guide the incident energy calculation follows.

Confirm the current edition of each standard with your engineer, because they are revised on a regular cycle.

When Does a Commercial Building Need a Study?

  • Your building has never had one, and electricians or maintenance staff work on energized equipment.

  • The existing study is more than five years old.

  • You upgraded a service, added a transformer, or changed breakers, fuses or settings. Our panel and service upgrade work is a common trigger.

  • The utility changed the available fault current on your service.

  • An insurer, lender or new tenant asks for current labels or documentation.

  • You are buying a building and want to know what the electrical liabilities are.

What the Arc Flash Label Tells You

A label produced from a study is more detailed than the basic warning sticker. It typically shows the nominal voltage, the arc flash boundary, the incident energy at a stated working distance (or the required protective clothing category), the shock approach boundaries, and the date of the study. If a label has no date or no incident energy number, it generally does not reflect an actual calculation.

How the Electrician Fits In

The engineer calculates; the electrician makes the building match the report. That includes gathering accurate equipment data, installing the new labels, adjusting breaker trip settings, replacing worn or mismatched protective devices, and tightening and testing connections. Thermal imaging often finds the loose connections that raise risk before they fail. Ongoing electrical maintenance keeps the study accurate, because equipment that has been altered or neglected no longer matches the one-line diagram.

We coordinate with your engineer so the field work follows the report and the paperwork stays current. See our electrical compliance and safety testing service for what that looks like.

Ways to Reduce Arc Flash Risk

  • De-energize equipment before working on it whenever possible. This is the single most effective control.

  • Use maintenance switches or remote racking to keep people out of the arc flash boundary.

  • Reduce clearing times with properly set or newer protective devices.

  • Keep equipment clean, tight and inspected.

  • Train workers in the label system and the required protective clothing.

Frequently Asked Questions

How much does an arc flash study cost?

It depends on the size and complexity of the system, so there is no single figure. Pricing is driven by the number of pieces of equipment, how complete your existing drawings are, and whether the engineer must survey the site. Ask for a written scope that lists the equipment counted and the deliverables.

Who is allowed to perform an arc flash study?

The calculations are normally performed by a qualified electrical engineer using software built on the IEEE 1584 method. Your electrician supports the study by collecting field data and then carries out its recommendations.

How often does an arc flash study need to be updated?

NFPA 70E says the arc flash risk assessment must be reviewed at least every five years and whenever the electrical system changes in a way that affects it, such as a new service, transformer or protective device.

Is an arc flash label required by code?

Yes for most commercial and industrial equipment likely to be worked on while energized. The National Electrical Code requires a field-applied warning label. A study-based label that lists incident energy goes further than the code minimum.

Does a small building need an arc flash study?

Any commercial building with equipment that is serviced while energized has a hazard to assess. Smaller systems with low available fault current often produce lower incident energy, but the answer comes from calculation, not size.

Talk to a Commercial Electrician

If you are planning this work in King or Snohomish County, call (425) 583-4869 or request a quote online. Electrical Support Company is a union signatory commercial electrical contractor based at 19031 33rd Ave W, Suite 301, Lynnwood, WA 98036.